Service
Storey Removal (Removing Upper Floors)
Storey removal means taking off a building's upper floors without demolishing the whole building. It is used to remove unauthorised or extra floors, and when the load on the building needs to be reduced.

For this work we lift our 5-ton mini excavator onto the roof with a mobile crane. Starting from the top floor, the machine breaks up the slab, walls and columns piece by piece with the breaker and bucket, and the rubble is brought down in a controlled way.
Working from the top down limits the effect on the floors that are staying and on the buildings next door. That is why this method is preferred on narrow streets and where buildings stand wall to wall.
How we work
- 01
Site visit
We look at the building, the street and where the crane will stand, and plan how the machine will be lifted up.
- 02
Lifting the machine up
The mini excavator is placed by mobile crane on the roof or on the slab of the floor to be removed.
- 03
Floor-by-floor removal
We start on the top floor with the breaker and bucket, and move down to the next floor once each one is finished.
- 04
Bringing the machine down
Once we reach the required floor, the machine is lifted back down by crane.
Common questions
How do you get the machine onto the building?
With a mobile crane. The mini excavator is placed on the roof or on the slab of the floor to be removed, and lifted back down by crane when the work is finished.
What is the difference between storey removal and demolition?
In storey removal only the agreed upper floors are taken off and the rest of the building stays in place. If the whole building is coming down, that is a demolition job.
On site
Planning excavation, demolition or storey removal?
Call us, or send the job location and a few photos on WhatsApp. We'll look at the job and get back to you.